Pumafix® TQV

2-component fast curing vinylester injection resin.


Download technical data sheet


Additional information

Technical Caracteristics

Pure resin based vinylester (styrene free).

Advantages and Uses

  • Chemical bonding of horizontal and vertical anchors.
  • Suitable for wet and dry substrates.
  • Indoor and outdoor.
  • Suitable for solid and hollow substrates.
  • Anchoring machinery
  • Anchoring bars, bolts, rods, plates…
  • Fixing doors, railings, blinds, awnings, signs, aerials…
  • For concrete, stone, brick or hollow concrete substrates.
  • For assembling prefabricated concrete elements.
  • Excellent mechanical resistance.
  • Fast curing.
  • Thixotropic, for both vertical and horizontal use.

Suitable Substrates

  • Substrates must be resistant, stable, sound and clean, free of dust, demolding agents, organic products, etc. 
  • Once the perforation of the substrate has been made, clean any residue using compressed air or a cylindrical brush. 

Application Procedure

INSTRUCTIONS FOR USE INSTALLATION INSTRUCTIONS IN SOLID BRICKWORK FACTORY

  • Drill a hole in accordance with the diameter and depth shown on the application table.  During the drilling process, the perpendicularity of the hole in the substrate should be checked. 
  • Clean the hole of dust, fragments, oil, water, grease and other contaminants before injecting the mortar (with the manual blower and standard manual brush). 
  • The cleaning of the hole consists of 4 blowing operations, 4 brushing operations followed by a further 4 blowing operations. 
  • Before brushing, the brush must be cleaned and the diameter checked to ensure it is the correct size.
  • The threaded rod must be free from any dust, grease, oil and other impurities.  
  • Unscrew the top of the cartridge, engage the mixing nozzle to the cartridge and position in the gun.   
  • At the start of using a new cartridge, eject some product until a uniform colour of the mortar appears.  
  • Fill the drilled hole uniformly from the bottom up to avoid air pockets, moving the nozzle slowly outwards. 
  • Fill 2/3 of the depth of the drilled hole with mortar. 
  • Insert the threaded rod slowly and with a slight rotating movement, remove the excess mortar injected from around the threaded rod. 
  • Wait the necessary curing time in accordance with the datasheet.
  • Do not move or load the anchor until the curing process has finished.  

INSTALLATION INSTRUCTIONS IN HOLLOW/PERFORATED BRICKWORK FACTORY

  • Unscrew the top of the cartridge, engage the mixing nozzle to the cartridge and position in the gun.   
  • At the start of using a new cartridge, eject some product until a uniform colour of the mortar appears.  
  • Fill the drilled hole uniformly from the bottom up to avoid air pockets, moving the nozzle slowly outwards. 
  • Fill 2/3 of the depth of the drilled hole with mortar. 
  • Insert the threaded rod slowly and with a slight rotating movement, remove the excess mortar injected from around the threaded rod. 
  • Wait the necessary curing time in accordance with the datasheet.
  • Do not move or load the anchor until the curing process has finished.
  • Remove the top of the plastic sieve.
  • Introduce the plastic sieve in the hole.
  • Fill the sieve uniformly from the bottom up, moving the mixing nozzle slowly towards the outside: move the mixing nozzle 10 mm  towards the outside each time you pull the trigger. 
  • Completely fill the sieve.
  • Place the top on the filled plastic sieve. 
  • Immediately insert the threaded rod slowly and with a slight rotating movement, removing the excess mortar injected from around the threaded rod. 
  • Wait the necessary curing time in accordance with the datasheet. 
  • Do not move or load the anchor until the curing process has finished.

 

Anchor Installation Resistance Permissible load
Rod class 8,8 Drill piece diameter d0 Hole depth hef Standard distance edges  CCr Standard distance anchors SCr

Torque Tinst

Charasteristic resistance
NRk
Concrete C20/25 Concrete C20/25
  [mm] [mm] [mm] [mm] [N.m] Traction
[kN]
Traction
​[kN]
Shear
[kN]
M8 10 80 80 160 10 29,3 11,6 8,1
M10 12 90 90 180 20 46,4 18,4 12,9
M12 14 110 110 220 40 63,8 25,3 18,7
M16 18 125 125 250 80 76,9 30,5 34,9
M20 24 170 170 340 120 112,7 44,7 54,4

Safety factor of 2.52 load stress

APPLICATION TABLE FOT CORRUTAGED CONCRETE BARS

Bar
diameter d5
Drill bit
diameter d0
Permissible load Fs in C20/25 concrete.
High tack 500 MPa corrutaged steel bar
[mm] [mm]

Hole
depth
Load
stress

[mm]
[kN]
[mm]
[kN]
[mm]
[kN]
[mm]
[kN]
[mm]
[kN]
[mm]*1
[kN]*1
8 10 Iv 80 120 160 200 240 322
    Fs [C20/25] 5,4 8,1 10,9 13,6 16,3 21,9
10 12 Iv 100 150 200 250 300 403
    Fs [C20/25] 8,5 12,7 17 21,2 25,4 34,2
12 16 Iv 120 180 240 300 360 483
    Fs [C20/25] 12,2 18,3 24,4 30,5 36,6 49,2
14 18 Iv 140 210 280 350 420 564
    Fs [C20/25] 16,6 24,9 33,3 41,6 49,9 66,9

*1 Maximum loads according to elastic limit of 500 MPa corrutaged steel

Recommendations

  • Do not use solvents.
  • On site use and adjustments to the product are only possible before the hardening of PUMAFIX TQV.
  • Store between 5º C and 25º C.
  • Consult the Technical Department for any application not specified in this Technical Datasheet.
  • For all information regarding safety during handling, transport, storage and use of product please consult the current version of the Product's Safety Sheet.

Packaging and Storage

380 ml 2-component cartridges. (application with special gun) and 280 ml. (application with mono-component product guns).Shelf life: up to 18 months in sealed original packaging, sheltered from weather conditions and humidity.

Technical data

(Statistical data obtained under standard conditions)

Density 1.75 Kg/dm³
Double the load times in wet conditions  
Min application temperature 5º C
Max application temperature 30º C
Working temperature interval after curing from -40º C to 80º C
 Application temperature Open time Curing time
5º C 15 min. 120 min.
10º C 12 min. 90 min.
20º C 6 min. 45 min.
30º C 3 min. 20 min.
 

Calculation method: F(kN)= d0 x Iv x Ψ c / 100
d and Iin mm, min. spacing  10 ds1 min. edge distance 5 ds

Concrete resistance
class
C12/15 C16/20 C20/25 C25/30 C30/37 C35/45 C40/50 C45/55 C55/60
(*) de Ø 8 mm a 25 mm  1,6 2 2,3 2,7 3 3,4 3,7 4 4,3
(**) 0,452 0,565 0,650 0,763 0,848 0,961 1,046 1,131 1,216
(*) de Ø 26 mm a 32 mm 1,6 2 2,3 2,7
(**) 0,452 0,565 0,650 0,763
(*) Ø 34 mm 1,6 2 2,3 2,6
(**) 0,452 0,565 0,650 0,735
(*) Ø 36 mm 1,5 1,9 2,2 2,6
(**) 0,424 0,537 0,622 0,735
(*) Ø 40 mm 1,5 1,8 2,1 2,5
(**) 0,424 0,509 0,594 0,707

* Charasteristic interchange resistance for good anchorage conditions (EC2) ft (MPa)
** Factor according to concrete type Ψ c
Ψ c = 0,06 x π x ft x Ψs2 / γ s
γ s = 1,15 safety coefficient
Ψs = 1,5 high tack bar coefficient (1) 
(1) For smooth bars use Ψs = 1,0

PERFORMANCE: NUMBER OF ANCHORS ACCORDING TO DIAMETER AND CARTRIDGE TYPE

Anchorage Concrete rods Corrutaged concrete bars
Diámetro 380 ml. 280 ml. 380 ml.  280 ml.
8 90/100 65/75 90/100 65/75
10 55/55 35/40 50/55 35/40
12 30/34 20/24 20/25 14/19
16 16/18 11/13 12/14 9/11
20 7/8 5/6 7/8 5/6

 

Notas

The information and instructions in this datasheet are based on our current tests and technical knowledge. They are intended as general guidance and do not constitute a binding commitment by PIDILITEPUMA MEA CHEMICALS LLC. It is the sole responsibility of the user to verify, prior to use, that the product is suitable for the intended application and to ensure that it is applied correctly and in accordance with applicable regulations and good industry practice.

PIDILITEPUMA MEA CHEMICALS LLC cannot control how its products are applied on site throughout the entire project and therefore cannot accept responsibility for their application by contractors or other parties involved in the execution of the work. Support visits to the jobsite by our technical staff do not change that. Our responsibility is limited exclusively to defects that can be directly attributed to the supplied products, whether used individually or as part of a system, caused by manufacturing defects.

 

It is the responsibility of the project designer, site manager, contractor, or other relevant professionals to ensure that the selected products are appropriate for the specific project, taking into account their properties, the substrate, site conditions, and any existing issues.

In the event of a claim, the original packaging must be provided to ensure proper product traceability.

Any performance values stated for PIDILITEPUMA MEA CHEMICALS LLC products or construction solutions, whether in UNE standards or other applicable standards, are based solely on the specific test conditions defined in those standards (such as substrate type, temperature, and humidity). These values may not apply to situations where products are tested or used under different conditions.